Complete Finishing Cost Guide (Tiles, Doors, Paint, Ceiling) – 2025
November 24, 2025
Every construction site in Pakistan is bleeding money most owners don’t even notice. A typical 10 Marla house (2,722 sq ft) wastes 8–15% of total materials — that’s PKR 1.3–2.8 million gone in cement dust, broken bricks, and steel cut-offs. At Afaq Ahmad Constructions, we’ve reduced wastage to under 4% across 200+ projects in DHA Lahore, Bahria Town, and Lahore Smart City. This 2025 guide reveals exactly how to reduce material wastage during construction and save hundreds of thousands to millions on your next build.
Why Material Wastage Is a Silent Killer in 2025
With cement at PKR 1,060–1,440/bag, steel at PKR 236–269/kg, and bricks at PKR 11–18 each, every percentage of waste hurts more than ever. The average Pakistani construction site loses:
| Material | Typical Wastage % | Cost Loss (10 Marla House) |
|---|---|---|
| Cement | 8–12% | PKR 150,000–300,000 |
| Bricks | 10–15% | PKR 200,000–400,000 |
| Steel | 5–10% | PKR 150,000–300,000 |
| Tiles | 10–18% | PKR 100,000–250,000 |
| Sand & Aggregate | 8–12% | PKR 80,000–150,000 |
| Total | 8–15% | PKR 1.3–2.8 million |
That’s money literally thrown in the trash — or sold as raddi for PKR 10/kg.
Proven Strategies to Reduce Wastage to Under 4%

1. Accurate Material Take-Off (MTO) Using Software
- Old Way: Manual counting → 10–20% error
- 2025 Way: Use BIM software or Excel MTO templates
- Savings: Reduces over-ordering by 7–12% (PKR 800,000–1.5 million)
- How We Do It: Our engineers generate exact quantities within ±2% accuracy

2. Bulk Purchasing with Just-in-Time Delivery
- Mistake: Ordering everything at once → cement expires, steel rusts
- Smart Way: Phase-wise delivery
- Week 1–8: Foundation materials only
- Week 9–20: Grey structure materials
- Week 21+: Finishing materials
- Savings: 5–8% (PKR 600,000–1.2 million) + zero expiry losses

3. Proper Storage & Protection
- Common Loss: Cement bags left in rain → 20–30 bags ruined (PKR 25,000–40,000)
- Solution:
- Elevated platforms + tarpaulin cover
- Steel stored on wooden sleepers with oil coating
- Tiles kept in shaded, dry area
- Cost: PKR 50,000–100,000 investment
- Savings: PKR 300,000–600,000 over project life
4. Cut Optimization for Steel & Wood
- Wastage Cause: Random cutting → 10–15% offcuts
- Smart Cutting: Use bar bending schedules and cutting lists
- Example: For 2.5 tons steel, save 150–250 kg (PKR 40,000–70,000)
- Tool: Free software like BBSCalc or our in-house optimizer

5. Tile Cutting Optimization
- Average Wastage: 12–18% (mostly from poor planning)
- 2025 Method:
- Start tiling from center of room
- Use large-format tiles (24×48″) → fewer cuts
- Pre-plan cuts with tile layout software
- Savings: Reduce from 15% to 5–7% → PKR 100,000–200,000

6. Reuse & Recycle On-Site
- Broken Bricks: Use as filling for plinth or landscaping
- Concrete Debris: Crush and reuse as PCC base
- Wood Formwork: Reuse 3–5 times with proper oiling
- Savings: PKR 100,000–250,000 per project
7. Train & Supervise Labor
- Biggest Wastage Source: Untrained masons
- Solution:
- Daily briefing on material handling
- Assign accountability (e.g., one mason per 1,000 bricks)
- Weekly wastage audit
- Result: Wastage drops from 12–15% to under 5%
Real Project Example – Afaq Ahmad Constructions
10 Marla House in DHA Phase 9 Prism
| Item | Industry Average Wastage | Our Wastage | Savings (PKR) |
|---|---|---|---|
| Cement | 10% | 3% | 180,000 |
| Bricks | 12% | 4% | 280,000 |
| Steel | 8% | 2% | 160,000 |
| Tiles | 15% | 5% | 180,000 |
| Total Saved | 808,000 |
Client received a PKR 808,000 cashback at project completion.
2025 Cost-Saving Checklist
- Use BIM/Excel for accurate MTO
- Order materials in 4 phases
- Store under elevated, covered area
- Apply anti-corrosion oil on steel
- Use cutting optimization software
- Start tiling from room center
- Reuse broken bricks for filling
- Train masons on wastage reduction
- Weekly wastage audit by supervisor
- Hire Afaq Ahmad Constructions (we do all this automatically!)
The Afaq Ahmad Constructions Promise
Every project includes our Zero Wastage Guarantee:
- Wastage below 4% or we pay the difference
- Free material take-off with every contract
- 10-year warranty on all work
Visit https://afaqahmadconstructions.com/ to start your zero-wastage build today!
Conclusion
Reducing material wastage from the national average of 12–15% to under 4% can save PKR 1–2.8 million on a typical 10 Marla house in Pakistan in 2025. With accurate planning, smart sourcing, proper storage, optimized cutting, and professional supervision, you turn waste into wealth.
Why lose lakhs when you can save them?
Contact Afaq Ahmad Constructions now — because every brick counts.