
Grey Structure Cost Breakdown in Pakistan – Updated Rates 2025
December 3, 2025
Door Types and Prices in Pakistan – Which One Should You Choose in 2025?
December 9, 2025
Pakistan’s real estate market is thriving with a projected growth rate of over 5% annually through 2028. With a housing deficit exceeding 10 million units, homeowners in Lahore, Islamabad, and Karachi are investing in reliable electrical systems for their 5 Marla (PKR 7–12 million) to 10 Marla (PKR 16.3–20 million) homes. At Afaq Ahmad Constructions, we’ve completed hundreds of projects and tracked every wire and switch. This 2025 guide provides a complete breakdown of electrical work costs for 5 Marla and 10 Marla houses, including wiring, fixtures, labor, and trends to ensure safety and efficiency amid rising rates.
Why Electrical Work Costs Are Rising in 2025
Electrical work typically accounts for 8–12% of your total construction budget—PKR 560,000–1.2 million for a 10 Marla house. The Pakistan Engineering Council (PEC) standards and Pakistan Building Code (PBC) 2021 mandate fire-resistant wiring and overload protection, while inflation has pushed copper wire prices up 5–7% (PKR 1,200–1,800 per roll). Labor rates at PKR 450–550/day and material costs (conduits PKR 200–500/meter) reflect global supply chain issues. Proper planning saves PKR 100,000–200,000 and prevents hazards like short circuits, which cost PKR 200,000–500,000 to fix.

Key Components of Electrical Work
Electrical work includes concealed wiring, switches/sockets, distribution boards (DBs), fans/lights, MCBs/RCDs, and earthing. For a 5 Marla house (1,125 sq ft plot, ~1,500 sq ft covered), expect 150–200 points; for 10 Marla (2,250 sq ft plot, ~3,000 sq ft covered), 250–350 points. Costs break down as:
- Wiring & Conduits: 40–50% of total
- Switches & Fixtures: 20–25%
- DBs & Safety: 10–15%
- Labor: 15–20%

Electrical Work Cost Breakdown for 5 Marla House (2025)
A 5 Marla double-story house requires basic to mid-range electricals for 2–3 bedrooms, kitchen, and living area. Total covered area: ~1,800–2,000 sq ft. Average cost: PKR 925,000–1,300,000 (PKR 462–650/sq ft).
| Component | Description | Material Cost (PKR) | Labor Cost (PKR) | Total (PKR) |
|---|---|---|---|---|
| Wires & Cables | 2.5–4 sq mm PVC-insulated copper (e.g., Pakistan Cables) | 300,000–400,000 | Included | 300,000–400,000 |
| Conduits & Accessories | PVC conduits (25mm), junction boxes, fan hooks | 40,000–60,000 | 20,000–30,000 | 60,000–90,000 |
| Switches & Sockets | Modular switches (e.g., Schneider, Clipsal; 150–200 points) | 150,000–200,000 | 30,000–50,000 | 180,000–250,000 |
| Fans & Lights | Ceiling fans (6–8), LED lights (20–30 fixtures) | 80,000–120,000 | 20,000–30,000 | 100,000–150,000 |
| DBs & Safety Devices | 8–12 way DB, MCBs, RCD, earthing kit | 100,000–150,000 | 20,000–30,000 | 120,000–180,000 |
| Miscellaneous | Bells, exhaust fans, wiring for AC points | 50,000–80,000 | 10,000–20,000 | 60,000–100,000 |
| Contingency (10%) | Buffer for extras | N/A | N/A | 92,500–130,000 |
| Grand Total | 925,000–1,300,000 |
- Per Sq Ft: PKR 462–650 (up 5% from 2024).
- Regional Variation: Lahore (PKR 450–600/sq ft), Karachi (PKR 480–650/sq ft), Islamabad (PKR 500–700/sq ft).
- Tip: Use local brands like Pakistan Cables for 10–15% savings (PKR 90,000–130,000).

Electrical Work Cost Breakdown for 10 Marla House (2025)
A 10 Marla double-story house needs mid to premium electricals for 3–4 bedrooms, 2 bathrooms, kitchen, and lounge. Total covered area: ~3,500–4,000 sq ft. Average cost: PKR 1,300,000–1,800,000 (PKR 325–450/sq ft).
| Component | Description | Material Cost (PKR) | Labor Cost (PKR) | Total (PKR) |
|---|---|---|---|---|
| Wires & Cables | 2.5–6 sq mm PVC-insulated copper (250–350 points) | 500,000–700,000 | Included | 500,000–700,000 |
| Conduits & Accessories | PVC conduits (25–32mm), junction boxes, hooks | 80,000–120,000 | 40,000–60,000 | 120,000–180,000 |
| Switches & Sockets | Modular switches (e.g., Legrand; 250–350 points) | 250,000–350,000 | 50,000–80,000 | 300,000–430,000 |
| Fans & Lights | Ceiling fans (10–12), LED lights (40–50 fixtures) | 150,000–250,000 | 40,000–60,000 | 190,000–310,000 |
| DBs & Safety Devices | 16–24 way DB, MCBs, RCD, surge protectors | 150,000–200,000 | 30,000–50,000 | 180,000–250,000 |
| Miscellaneous | Bells, exhaust fans, AC/gyser points, smart wiring | 100,000–150,000 | 20,000–40,000 | 120,000–190,000 |
| Contingency (10%) | Buffer for extras | N/A | N/A | 130,000–180,000 |
| Grand Total | 1,300,000–1,800,000 |
- Per Sq Ft: PKR 325–450 (up 6% from 2024).
- Regional Variation: Lahore (PKR 320–440/sq ft), Karachi (PKR 340–470/sq ft), Islamabad (PKR 350–480/sq ft).
- Tip: Add smart wiring (PKR 150,000–300,000) for 10–15% future-proofing.
Factors Influencing Electrical Work Costs in 2025
1. Material Quality
- Basic (Local Wires): PKR 300,000–500,000 (Pakistan Cables, 2.5 sq mm).
- Premium (Imported): PKR 500,000–800,000 (Finolex, 4 sq mm copper).
- Tip: Use fire-retardant wires (PKR 100–200/meter extra) for PBC compliance.
2. Number of Points & Load
- Basic (150 points): PKR 900,000–1.2 million for 5 Marla.
- Premium (350 points, AC-ready): PKR 1.5–2 million for 10 Marla.
- Tip: Plan for 1.5 kW load per room to avoid overloads.
3. Labor & Installation
- Labor: PKR 50–80/sq ft (PKR 90,000–160,000 for 5 Marla; PKR 175,000–320,000 for 10 Marla).
- Tip: Hire PEC-certified electricians (PKR 60–100/sq ft) to avoid fines.
4. Inflation & Supply Chain
- Rise: 5–7% in 2025 due to copper prices and imports.
- Tip: Lock rates with contracts; bulk buys save 5–10% (PKR 50,000–100,000).

2025 Electrical Trends for Pakistani Homes
- Smart Wiring: App-controlled switches (PKR 150,000–300,000 extra).
- Solar-Ready: Provisions for panels (PKR 100,000–200,000).
- EV Charging: Ground-floor outlets (PKR 50,000–100,000).
- LED Integration: Built-in lighting saves 15–20% on bills.
Step-by-Step Guide to Budgeting Electrical Work
1. Assess Your Needs
- Step: Count rooms, appliances (ACs, geysers), and points.
- Details: 5 Marla: 150–200 points; 10 Marla: 250–350.
- Tool: Use our QA blog’s checklist.
- Tip: Add 20% buffer for extras.
2. Choose Materials
- Step: Select wires, switches, and DBs.
- Details: Copper over aluminum for safety.
- Tool: Check PEC-approved lists.
- Tip: Buy from trusted suppliers like Ravi Road, Lahore.
3. Hire Professionals
- Step: Get 3 quotes from PEC electricians.
- Details: Fixed price vs. daily rates.
- Tool: Verify licenses.
- Tip: Include testing (PKR 10,000–20,000).
4. Plan Installation
- Step: Schedule during grey structure phase.
- Details: Concealed wiring before plastering.
- Tool: Coordinate with contractors.
- Tip: Dry season (October–March) to avoid delays.
5. Test & Maintain
- Step: Final load test and annual checks.
- Details: PKR 10,000–20,000/year.
- Tool: Use our maintenance blog.
- Tip: Add surge protectors (PKR 5,000–10,000).

Challenges and Solutions in 2025
Challenges
- Inflation: Copper up 5–7% (PKR 50,000–100,000 extra).
- Supply Delays: Imports add 1–2 weeks.
- Overloads: Poor planning risks fires.
- Labor Shortages: Rates up 5–10%.
Solutions
- Buffer Budget: Add 10–15% (PKR 130,000–270,000).
- Local Sourcing: Use Pakistan Cables for 10–15% savings.
- Load Calculation: Hire engineers (PKR 20,000–50,000).
- Expert Help: Afaq Ahmad Constructions ensures PEC compliance.
2025 Market Context
- Demand: High in DHA Lahore for smart electricals.
- Trends: Solar integration and EV-ready wiring.
- Costs: 5–7% rise; contingency essential.
- Solution: Afaq Ahmad Constructions offers fixed packages.
Visualizing Your Electrical Budget
Imagine a 5 Marla home in Johar Town with basic wiring (our villa image), a 10 Marla house in Bahria Town with modular switches (our bungalow image), and a 1 Kanal estate in DHA Lahore with smart DBs (our roofing image). Afaq Ahmad Constructions powers your home safely.
The Role of Afaq Ahmad Constructions
At Afaq Ahmad Constructions, we electrify with excellence:
- PEC-Certified Teams: Zero defects guaranteed.
- Fixed Packages: PKR 925,000–1.8 million with warranty.
- Smart Upgrades: Solar-ready at no extra cost.
Visit https://afaqahmadconstructions.com/ to get your 2025 electrical quote today!
Conclusion
Electrical work for a 5 Marla house in Pakistan 2025 costs PKR 925,000–1.3 million (PKR 462–650/sq ft), and for 10 Marla PKR 1.3–1.8 million (PKR 325–450/sq ft), including wires (PKR 300,000–700,000), conduits (PKR 60,000–180,000), switches (PKR 180,000–430,000), fans/lights (PKR 100,000–310,000), DBs (PKR 120,000–250,000), and labor (PKR 90,000–320,000). With inflation at 5–7%, plan a 10–15% buffer. Afaq Ahmad Constructions ensures safe, efficient systems. Contact us now!





